With a little over one month to go in the comment period on the FAA’s proposed rules for the Operation and Certification of Small Unmanned Aircraft Systems, and facing the prospect of at least another year before those rules become final, many energy and infrastructure companies are moving forward with their small unmanned aerial vehicle (UAV) plans under the FAA’s existing rules.
By
Thomas Dougherty, II | Lewis Roca Rothgerberon March 19, 2015 at 4:00 PM